- Foundation was stone for the cob section and a shallow poured concrete for the frame section.
- Framed walls going up.
- With a frame to throw a tarp on, we could finally get down to cobbing.
- First windows going in.
- The earthen floor was put in before the walls got too high so that the floor would dry quickly with good circulation.
- Looks done, but still a ways to go.
- An interior shot, the walls as yet unplastered.
- Another interior. I held onto these windows from our house reno hoping i would find a good use for them.
- I decided the lower part of the cobbage needed a little dressing up.
Leave a Reply